Then nail the flooring planks with a standard flooring nailer see photo for details.
How to fit oak flooring on concrete.
Typically used for engineereed hardwood staple down installation works well with 3 8 5 8 inch flooring.
Here s how to install flooring using the staple down method.
Oak flooring installation labor basic basic labor to install oak flooring with favorable site conditions.
Acclimate cull and blend flooring.
Blind nail wood flooring.
If you re moving into a brand new home or you just poured the concrete slab the concrete needs to cure before you can install hardwood flooring over it.
Treated plywood to the concrete with concrete screws spaced every 16 in.
Begin with the first row pre drilling holes.
How to install click lock engineered hardwood flooring easy home renovation project for beginners.
Lay the 1x4s perpendicular to the direction you intend to install the floor planks.
It takes 6 to 8 weeks for concrete to cure depending on climate and the concrete mixture.
Includes planning equipment and material acquisition area preparation and protection setup and cleanup.
Install underlayment on clean level subfloor.
It s really important when fitting your new engineered wood flooring to an existing concrete sub floor that the sub floor is in good condition and has an appropriately low moisture content.
How to lay solid wood flooring over a concrete subfloor the first consideration you will need to make is how you are going to attach your planks to the floor.
Floating a floating floor doesn t require any glue or nails although you may use glue between the tongue and the groove to keep the planks together.
One method to overcome this when laying a solid oak floor would be using the above method of laying out battens.
Ideally the moisture content should be no more than 8 and ideally less.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
Next using your hammer insert a nail 1 inch from the wall and about every 4 inches along the board.
As time has progressed the need to fit oak flooring into ever changing conditions has increased.
As far as concrete is.
More and more people choosing oak floor to be laid at their houses want to install it over concrete subfloor.
The solid oak flooring could then be simply nailed or screwed down.