While taking a shortcut through the flooring section i noticed that they had vinyl peel an stick faux wood flooring planks for sale for around 1 each.
How to install laminate floor planks as a backsplash.
Lay out the unopened boxes of laminate planks in the room.
How to install laminate flooring.
If you are installing the flooring below grade or in a room like a basement with high humidity or moisture lay down a vapor barrier before you install the flooring.
They should acclimate for at least 48 hours.
Start at one side of the area you are covering and measure the size of the piece you need for the very bottom.
How to install vinyl plank flooring as a beginner.
Since the material you will be working with is laminate you will be adhering the material to your wall with a strong adhesive.
I headed to my favorite home improvement store to buy wood.
Vinyl plank flooring has all the visual appeal of solid hardwood flooring.
Measure the dimensions of your backsplash.
Vinyl flooring costs a fraction of the price of hardwood making it a great option for beginner home improvers.
So i decided to try a plank wall backsplash.
The first step in installing a laminate backsplash is to make a careful assessment of the wall space where you will be installing the guard.
Learning how to install vinyl flooring is something you can do yourself.
See my flooring install playlist.
In this video i am showing how to install laminate flooring for the first time.
Be sure to cut spaces for the outlets.
Set the template in place and tweak it until it fits the backsplash area perfectly.
Take your adhesive loctite and put on the back of the flooring.
Slide the first two rows into their final position and repeat steps 5 and 6 above using the same alternating plank technique to complete the process.
When installing a floating laminate floor you don t need to use any adhesive nails or staples.
Using a large sheet of paper or cardboard transfer the measurements to the paper then use scissors to cut a template.
This adhesive is what makes it stick to the wall.
Install baseboards and molding remove the spacers around the border and install baseboards and quarter round molding covering the plastic moisture barrier on the wall and the gap between the wall and the flooring.