Then nail the flooring planks with a standard flooring nailer see photo for details.
How to install nail down wood flooring on concrete.
With a nail down engineered hardwood floor follow the same subfloor preparation steps as above including underlayment and laying spacers around the room s perimeter to maintain the manufacturer s recommended expansion gap.
You simply nail the boards with a flooring nailer.
This installation method is identical to staple down only the fastener and fastening tool differ.
Used when installing solid hardwood nail down installation is chosen due to how quickly and cost effectively it can be done.
Align the first board with the layout line with the tongue facing into the room.
Here s how to install flooring using the nail down method.
Plywood subfloor panels of 5 8 thickness or higher are recommended.
Installing floors is a difficult diy job.
The easiest way to install hardwood is a floating floor.
Basement wood flooring options.
Solid hardwood flooring only can be installed on or above ground level with a plywood subfloor.
How to install a nail down subfloor over concrete as with other installation methods a moisture control vapor retarder is recommended for on grade and below grade nail down installations.
Installing hardwood flooring on a plywood covered slab is identical to installing it on a wood subfloor.
Some engineered wood flooring products are designed for a glue down application when installing flooring over a concrete slab.
Lay the 1x4s perpendicular to the direction you intend to install the floor planks.
You have two basement wood flooring options solid hardwood or engineered.
Always check with the manufacturer s instructions to determine if your hardwood floor can be installed over an in floor radiant heat system.
Other products are better suited for a nail down installation where they are secured to a wood subfloor with nails or staples.
Engineered flooring can be installed above grade at grade and below grade level do not install hardwood flooring in bathrooms.
Treated plywood to the concrete with concrete screws spaced every 16 in.
You may not need to build a plywood subfloor on top of the concrete slab depending on the floor system you choose.