Step 1 stake off your area to level.
How to level dirt floor.
Just a short video on a way to use junk tracks to make a floor in a dirt floored storage building.
Attach a string level to the strings to determine the high point.
Lay the level on the ground beside the stakes.
For garages it is a little less simple.
Mark the height you want your floor with highly visible ribbon paint or marker.
Part of the garage we did years ago and it has worked very.
The bubble should be in the same location as it was when placed on the top of the stakes.
Adjust the slope of the ground as necessary to match the.
Use a long carpenter s level to make sure the.
Set a designated elevation to use as a guide to level the area.
Finish by starting at the farthest point from the door and leveling the sand with a trowel.
You will have to make sure your joists can handle the addition of considerably more weight from the plywood subfloor and any floor coverings.
Leveling compound is the classic and the easiest to fix a floor that is uneven.
Attach strings to stretch between the stakes a few inches above the ground.
Use a carpenter s level to ensure that the new surface is flat and level.
Check the level with a carpenter s level before placing the flooring making certain that its level to keep your floorboards level in turn.
Drive wooden or plastic stakes around the area to be leveled step 2 use a string level.
Remove 1 inch of dirt from the floor of the shed with a shovel.
Use this process to smooth out any major bumps or imperfections in the dirt floor.
A plywood subfloor will bridge any minor waves in the existing floor and leveling compound would help too.
Level the floor with a rake and then compress the dirt with a tamp to create a solid surface.
It is essential that you do not remove the marker until the ground leveling is complete.
This area does not need to be perfectly square or rectangular unless you are planning on using sod instead of simply replanting your grass.
Spread the sand evenly over the dirt floor using a rake.
This will usually be your starting point and the rest of the ground will be brought to.
In fact for some interior floors it s just a matter of pouring leveling compound out and letting it find its own level.
Place a length of pipe rebar or wooden stake securely into the ground.
On the top side of the floor another fix it idea to lay down new hardwood over the existing floor.