They should acclimate for at least 48 hours.
How to lay laminate timber flooring on concrete.
These are the challenges.
For a concrete subfloor you should install the plank with the sight lines of the floor.
This article is about how to lay laminate flooring on concrete.
Moreover the laminate flooring is easy to maintain and durable if you clean it regularly with appropriate products.
Picking the right underlay installation process.
The laminate flooring is cheap and comes in a large diversity of colors thicknesses and finishes as you can easily find one to fit your needs and tastes perfectly.
For long term performance your laminate wood floor needs to be dry level and clean.
How to install laminate flooring over concrete important.
Protecting laminate flooring from moisture.
Having complete focus on process as well as researching prior to the event are important keys here.
Let s start with the moisture problem.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
The challenges of laying laminate on concrete.
Before the installation itself leave laminate boards in the room for some time.
Concrete is extremely hard so homeowners might mistakenly believe it is impenetrable.
Typical sight lines run parallel to the longest wall but each home is different.
How to install underlayment for laminate flooring on concrete.
If you lay the laminated flooring on new concrete floors you must know that the period of the complete drying is about 80 days.
If you are installing the flooring below grade or in a room like a basement with high humidity or moisture lay down a vapor barrier before you install the flooring.
Lay out the unopened boxes of laminate planks in the room.
Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
There s a long list of things you need to do before during and after such kind of installation.
Measure and mark the center of all four walls at floor level.